Rebuild of Recovery Boiler 1

Environment
Photo 2
October 2016
Project start
November 2017
End of implementation
USD 28.7 million
Volume of investments

Project goals

  • Ensure RB1 continuous operation with a high black liquor burning load 
  • Reduce the environmental footprint: reduce dust emissions, eliminate emissions from the smelt tank smoke stacks 
  • Upgrade RB safety systems 

Project scope

  • Install a new precipitator  
  • Install RB new equipment 
  • Install new safety controls