Investment projects
Bratsk
Koryazhma
Ust-Ilimsk
Eng
Русский
English
中文
Replacement of the handling line
Harvesting
Rebuild of Recovery Boiler 1
Environment
Photo
2
Photo
Share on social networks
October 2016
Project start
November 2017
End of implementation
USD 28.7 million
Volume of investments
Project goals
Ensure RB1 continuous operation with a high black liquor burning load
Reduce the environmental footprint: reduce dust emissions, eliminate emissions from the smelt tank smoke stacks
Upgrade RB safety systems
Project scope
Install a new precipitator
Install RB new equipment
Install new safety controls